Current pre-underways include:
- Complete the 80 grit sanding on the barrier coat for Baltoplate
-Install depth and speed sensors (ready to go)
-Spray Baltoplate
-Wet Sand Baltoplate
-Burnish Baltoplate w/ bronze wool
-Move pads - Barrier and spray Baltoplate- wet sand and burnish.
-Paint Red boot stripe.
-Sand oxidation out of blue stripes
-Polish and buff hull / stripes.
-Repair flat tires on trailer.
-Replace fuel tank & muffler. (run diesel)
-install prop.
-reinstall head valves
-reinstall bilge pump / float switch
-replace manual bilge pump hoses.
-install new batteries.
FLOAT!
Then the rigging!
New Goal - Southern Bay Race Week starts June 1st!
42 days - 1017 hours - 61046 minutes 3662812 seconds